La Cantera Greenway
History of the Railway
The La Cantera Greenway is the result of the conversion of the old railway route that fell into disuse after the closure of Line 1 of the TRAM between the Sangueta and Isleta stops, when the railway branch of the Serra Grossa tunnel started operating at the end of 2018.